Skip to content

How to Fill Out an FLHA: Alberta Guide and Worked Example

See a fictional completed FLHA example, connect each hazard to a control and responsible person, and adapt the record to your crew, task and site.

Updated . Example for learning; assess the actual work before starting.

A completed FLHA example, with the work still on hold.

Write the task and conditions first. For each hazard, record the control, who will put it in place and how it will be checked. Then record crew participation and what would trigger another assessment. A completed form can correctly say do not start.

SYNTHETIC EXAMPLE — FICTIONAL CREW AND SITE

The entries below show a supervisor documenting a planned flare-line tie-in. They are not a real customer record, a complete hazard assessment, a permit or an approved work method. No signatures or safety clearance are implied.

Illustrative FLHA record: planning stage, work on hold
FieldExample entry
Date, location and taskOctober 21, 2026, 07:10. Fictional North Yard, work area A. Review the proposed flare-line tie-in before mobilizing equipment.
Conditions observedFrozen surface over soft ground after a thaw; wind; another crew near the planned work area.
Ground stability hazardPotential equipment instability. Supervisor to keep equipment out of the affected area until the ground and proposed support are assessed by the appropriate competent person under the site procedure. Verification: assessment and controls pending.
Nearby crew and suspended-load hazardPotential contact with people in the work area. Supervisor to coordinate with the other crew and verify the approved lifting plan, exclusion area and communications before any lift. Verification: coordination pending; no lift authorized.
Buried or connected servicesPotential contact with services or stored energy. Supervisor to confirm the applicable permits, service information, isolation and site-specific procedures with the responsible people. Verification: documentation and controls pending; no excavation or tie-in authorized.
Crew reviewFour fictional workers discussed the listed concerns with the supervisor. Actual names, participation and any required sign-ons must be captured on the real form. No signatures are supplied in this example.
Status and next reviewHOLD. Supervisor to reassess with the crew after the pending checks, or if the task, ground, weather, equipment or nearby work changes. Record the actual review time and decision.

For a blank starting point, use Alberta's hazard assessment template package. The province instructs users to customize the templates to their work and site. Apply your employer's approved form, procedures and risk-rating method where required.

Assess before work starts. Involve the workers. Write it down. Control what you found.

Part 2 of the Alberta Occupational Health and Safety Code covers hazard assessment, elimination and control. In plain terms it asks four things of an employer: assess the work site for existing and potential hazards before work begins and again when things change; involve the affected workers in that assessment and tell them what it found; record the assessment in writing, dated; and then eliminate the hazards you can and control the ones you cannot, in that order.

A field level hazard assessment records the crew's site-specific review. It supports the wider hazard assessment process; the form alone does not establish that the hazards have been adequately assessed or controlled.

Seven things, in this order.

  1. 01

    The date, the site and the task

    Where exactly, which job, what the crew is about to do. A site name a stranger could find. If the crew moves to a second site or a second task, that is a second FLHA.

  2. 02

    Today's conditions

    Weather, ground, light, wind, temperature, who else is working nearby, what equipment is on site. These are the lines that make the form true for today rather than true for every day.

  3. 03

    The hazards, specific to the task

    “Slips, trips and falls” is a category. “Ice on the north stairs to the lay-down yard” is a hazard. Name the thing a worker would recognize when they see it.

  4. 04

    A control for each hazard, in the right order

    The Code's order is: eliminate the hazard, then engineering controls, then administrative controls, then personal protective equipment. A form where every control is PPE is a form where nobody tried the first three.

  5. 05

    Who is on the crew, and their sign-on

    Every worker doing the task signs on after the hazards and controls have been gone through with them. Late arrivals sign on when they arrive, not at the end of the day.

  6. 06

    The permits, tickets and equipment the task depends on

    Hot work permit, ground disturbance clearance, fall protection plan, the tickets the workers need to hold. If the task needs one, the FLHA says which and confirms it is in hand.

  7. 07

    A second look when conditions change

    The weather turns, another trade arrives, the ground gives way. The Code's “reasonably practicable intervals” means the form gets reopened, not the day's first form treated as permanent.

The five ways an FLHA goes wrong

What auditors, investigators and injured workers see.

  • The same hazards every day, in the same handwriting, for months. Evidence that nobody looked.
  • Signed before it was read. Sign-ons at 7:00 for a task that was not decided until 7:40.
  • Controls that are all PPE. Gloves and glasses against a hazard that a barricade or a different sequence would have removed.
  • A site that cannot be found. "Yard" on a company with three yards.
  • Filed in the truck. The form existed; nobody in the office can produce it when the certifying partner or the investigator asks.

Documents, interviews, observation. The FLHA shows up in all three.

A COR audit checks a safety program three ways: by reading its documents, by interviewing workers and supervisors, and by watching work happen. The FLHA is the one record that appears in all three. The auditor reads a sample of forms for the things above. They ask a worker what today's hazards were and whether they helped identify them. They stand at the work and check whether the controls on the form are the controls in front of them.

The gap between a program that passes and one that struggles is rarely the form template. It is whether the forms describe today, whether the crew could repeat what is on them, and whether the office can find last March's.

The form on the phone, with no signal, in the journal by the time the truck is back.

Rate brings offline field forms, certification records and corrective actions into the contractor's operations platform. The fictional example above explains record preparation; it is not a screenshot or an approved Rate template. Use the field-app walkthrough to inspect the workflow, then bring your company's approved form to a demo to check the fit for your crew.

Rate Automation is not a safety consultant and not a law firm. The template helps a crew meet the Code; whether a specific assessment is adequate for a specific task is the employer's call, checked by their certifying partner and, where it matters, qualified Alberta counsel.

FLHA questions crews ask

Can I copy the completed example for my job?

Use it to understand how a record connects a task, hazard, control and verification. The example is fictional and deliberately does not authorize work. Your crew must assess its actual site and follow the employer's approved procedures and applicable requirements.

Can one FLHA cover the whole crew?

Use your employer's approved process for the task and crew. Record who participated, explain the hazards and controls to late arrivals, and record their review before they join the task. A copied list of names does not establish participation.

Is a photocopied FLHA with the same hazards every day a problem?

A repeated task can have repeated hazards, but the assessment still needs to reflect the actual conditions and controls. Review weather, ground, equipment and nearby work rather than assuming yesterday's record is enough.

How long do we keep FLHAs?

Confirm the retention period with your employer's record policy, certifying partner and qualified adviser, including any incident or legal hold. This example does not establish a universal retention period.

Official references: Alberta OHS Act, Regulation and Code, Alberta hazard assessment and control handbook and template package (both portal entries updated October 2023). General awareness; this guide does not certify a safe work method.

Start with one crew

Bring one crew and one form set.

Rate is safety compliance software for Alberta contractors. Crews file from a phone with no signal, tickets are watched, and the record is there when someone asks.

Book a 15-minute demo